Control ERP supply chain, schedule, workforce, eQMS, safety, and cryptographic sign-offs from one operational model.
Select one of the 4 enterprise operational pillars below to inspect the live client-side workspaces your teams use to turn complex portfolios into governed, audit-ready outcomes.
Live GPS/GIS Corridors, 7-Point DVIR Gate, Fuel Fraud Radar & TCO Replacement Curve
94.8%
Geotab / Samsara VMS Sync100% Checked
7-point + QHSE license lock$38,420
1 Over-Capacity Anomaly$0.68 / km
Depreciation + Fuel + WMS Parts| Asset & Custody | DVIR & Mission | Fuel Card & Telematics | Dual-Trigger PM | TCO & Book Value |
|---|---|---|---|---|
| FLT-019 Mercedes-Benz Sprinter 3500 (Mobile Service) Marcus Vance | Dispatched · 7/7 Passed Site B · Substation Phase 2 | 78% · 11.4 L/100km42,150 km | PM in 3,850 km / 64d | $0.48 / km (Optimal) |
| FLT-024 Volvo FMX 8x4 Heavy Articulated Hauler Stefan Lindqvist | Dispatched · 7/7 Passed North Corridor · Steel Girder Haul | 62% · 34.2 L/100km118,400 km | PM in 1,200 km / 19d | $1.12 / km (Optimal) |
| FLT-031 Toyota Land Cruiser 4x4 (Field Survey) Elena Rostova | Fuel Alert · 7/7 Passed Pipeline Sector 4 Inspection | FLAGGED: Rapid Refill (+15L over cap)68,900 km | PM in 6,100 km / 92d | $0.64 / km (Audit Hold) |
| FLT-008 Caterpillar 745 Heavy Earthmover Central Garage Bay 2 | Service · Locked (In Garage) Hydraulic Pump & WMS Spare Issue | 30% · Idle184,300 km | TCO Crossover Reached | $2.45 / km (Replace) |
Planning & Workflow Automation
FS / SS / FF dependencies, critical-path optimization, visual DAG workflow blueprints, and cron job scheduling.
Supply Chain & Commercial ERP
Multi-warehouse WMS, weighted average/FIFO inventory, 3-way landed cost receipts, AIA G702 billing, and dual-track GL.
Industrial eQMS, QHSE & e-Sign
ISO 9001 Cost of Poor Quality, IATF 8D CAPA, ISO 45001 safety mobilization locks, and PAdES/HMAC-SHA256 e-signatures.
Workforce, Fleet & Site PIAM
12-week capacity heatmaps, corporate travel & per diem caps, live GPS fleet TCO & fuel fraud radar, and ICAO MRZ guard gates.
How the Delivery Platform Synchronizes with ProjeX Business Suite
Opportunity CRM & Pre-Sales
Signed CRM proposals convert in 1 click into baseline WBS schedules and cost code budgets inside the Delivery Platform.
Delivery Platform & CPM Gantt
Execute CPM schedules, agile sprints, APQP gates, WMS material issues, and resource bookings with live critical-path tracking.
Business Suite Scalable ERP
Completed milestones, WMS goods issues, and approved timesheets automatically generate AIA G702 progress claims and General Ledger postings.
From pipeline to paid, one unified 22-module operational truth.
Start nimble with a Free Starter workspace, activate a 14-day in-app module showroom trial or 30-day team trial of the Business Suite, or contact our team for tailored enterprise licensing and bespoke custom workflows.
